1.工程概况阳谷堤防帮宽工程桩号194+485~194+605(3+000)~6+104,长3.224km。该堤段位于黄河下游左岸弯曲性河段上首,是山东黄河左岸的最上游,同时又是河南黄河的最下首,其中桩号194+485~194+605
1. Project Overview Yanggu embankment to help wide project Stake 194 + 485 ~ 194 +605 (3 + 000) ~ 6 +104, length 3.224km. The embankment section is located at the first bend of the left bank of the lower reaches of the Yellow River. It is the uppermost stream on the left bank of the Yellow River in Shandong and the lowest of the Yellow River in Henan. The stations 194 + 485-194 + 605