近年来,黑龙江省电力建设任务不断增加,“六五”期间新装机117.6万千瓦,“七五”期间装机将达242.5万千瓦,全省同时在建电厂达10个以上,不仅机组越来越多,且单台容量也从10万千瓦发展到60万千瓦,一期工程未完,二期工程任务书有时就已批下来,造成土建工程前后紧紧相接的局面。而土建工程重点在主厂房,主厂房施工占工期最长的是钢筋混凝
In recent years, Heilongjiang Province has seen an ever-increasing task of electric power construction, with 1.176 million kilowatts of new installed capacity during the “6th Five-Year Plan” period, and an installed capacity of 2.425 million kilowatts during the “7th Five-Year Plan” period. At the same time, the province has more than 10 power plants under construction, not only In many cases, the capacity of a single station also increased from 100,000 kilowatts to 600,000 kilowatts. The first phase of the project was not completed, and the second phase of the project’s mission books was sometimes approved, resulting in a tight connection between the civil engineering project and the project. The civil engineering works are mainly in the main plant. The longest construction period of the main plant is the consolidation of the steel bars.