论文部分内容阅读
文章论述了高地下水位流砂地层复杂,周边环境在不实施人工降低地下水位条件下,直接用新施工方法——钢沉箱周转法施工排水盲沟相应的安全管理与防护技术。
The article discusses that the groundwater level of the groundwater table is complex and the surrounding environment can be directly constructed with the new construction method - the steel caissan turnover method to construct the corresponding safety management and protection technology of the drainage blind ditch under the condition of not implementing artificial groundwater lowering.