练祁河宝钢厂区为总长1600m,规划河底高程为▽-1.0m,河道边坡为1:2.5,与宝钢南侧的围厂河相平行,两河中间间隔顶宽为12m的土堤。练祁河的水位由在其出口处(长江江堤处)的三孔节制间控制,但当汛期开闸排涝时,水深流急,致使河底和边坡冲刷、坍塌严重,河底的实际高程为▽-1.5~-2.5m,个别地达-3.5~-4.5m,与围厂河间的土堤最窄处已塌剩至9m,如不加固,将危及两河间土堤的安全,为此,宝钢厂决定对练祁河的河底和南侧边坡进行加固。
The Baishigang plant of Qijiang River is a total length of 1,600m. The planned elevation at the river bottom is ▽ -1.0m. The slope of the river is 1: 2.5. It is parallel to the Waicang River on the south side of Baosteel. The embankment has a top width of 12m between the two rivers. The water level of Lianhe River is controlled by a three-hole control system at the outlet of the Yangtze River (at the bank of the Yangtze River). However, when discharging flood water during flood season, the water depth and current will be impacted and the bottom and slope will scour and collapse seriously. Elevation -1.5 ~ -2.5m, individually -3.5 ~ -4.5m, and the Weizu River between the narrowest of the embankment has been left to 9m, if not reinforced, will endanger the safety of embankments between the two rivers Therefore, Baosteel decided to reinforce the river bottom and south slope of practicing Qi River.