巴基斯坦NAIMAT PHASE 5A&5B项目位于巴基斯坦信德省境内,南距卡拉奇约300公里。该项目分为A、B两期,5A包括2列处理能力为30MMSCFD的脱碳装置;5B包括1列处理能力为100MMSCFD的脱碳装置和TEG脱水装置,以及相应的公用工程和配套设施。该工程于2014年5月正式签订合同,5A项目仅用时11个月建成投产,5B项目仅用时13个月建成投产。作为中国石油工程建设有限公司(CPECC)西南分公司承揽的第一个系统外、海外总承包项目,项目组凭借“超低空飞行”的运作思
Pakistan NAIMAT PHASE 5A & 5B project is located in Pakistan’s Sindh Province, south about 300 km from Karachi. The project is divided into two phases A and B. 5A includes two decarbonization units with a capacity of 30MMSCFD. 5B includes one decarbonization unit with a capacity of 100MMSCFD and a TEG dehydration unit, with corresponding utilities and facilities. The project formally signed the contract in May 2014, the 5A project was completed and put into operation in only 11 months, and the 5B project was completed and put into production in only 13 months. As the first system contracted by the Southwest Branch of China National Petroleum Engineering Construction Corporation (CPECC), the overseas general contracting project and project team relied on the operation of “ultra-low-altitude flight”