论文部分内容阅读
继我国第一座全断面碾压砼贵州普定拱坝建成,我国又一座全断面碾压砼四川沙牌拱坝已于6月正式动工,大坝主体工程施工单位为建设过贵州普定拱坝电站的水电八局。沙牌电站位于四川汶川县草坡河上,是岷江支流草坡河上游的龙头电站,坝高130m,坝顶长238m,主体工程大坝是国家“九五”科技攻关项目,其中:“100m 以上高差真空溜管入仓工艺”、“全自动连续强制式砼拌和楼”等项目已列入国家“九五”科技攻关项目并进行攻关研究。沙牌电站代表了我国碾压砼筑坝的最高水平,在2000年,我
Following our country’s first full-face compacted concrete Puding arch dam in Guizhou Province completed, another full-face rolling concrete in Sichuan, Sichuan Shapai arch dam has officially started in June, the main dam construction project for the construction of Puding Arch Dam hydropower eight Bureau. Shapai Hydropower Station is located on Caopo River in Wenchuan County, Sichuan Province. It is the leading power plant in the upper reaches of Caopohe River, a tributary of Minjiang River. The dam height is 130m and the crest length is 238m. The main dam is a national “Nine Five ” scientific and technological project, in which: “100m above the height of the vacuum tube empty warehousing process ”, “automatic continuous compulsory concrete mixing floor ” and other projects have been included in the national “95” scientific and technological projects and research. Shapai Power Station represents the highest level of China’s RCC dam, in 2000, I