论文部分内容阅读
抚顺市位于浑河中上游,是东西狭长的带状城市,浑河横贯市区。1983年国务院批准了抚顺市城市总体规划,浑河整治工程是其中重要的组成部分.1986年末浑河综合治理工程开始建设。选择的设计方案为:最小堤距370m,清障、局部清滩,永安桥增孔66m,旧桥加固,新建两座橡胶坝,在不影响泄洪条件下满足工农业取水的水位及美化环境的要求。经过“95.7”洪水实践,证明综合治理工程措施正确,取得了巨大的效益。
Fushun City, located in the upper reaches of the Hun River, is a strip of long strip of the city, Hun River runs through urban areas. In 1983, the State Council approved the overall urban planning of Fushun City. Hunhe River Regulation Project is an important part of it. The Hun River comprehensive control project started construction in 1986. The selected design scheme is as follows: the minimum embankment distance is 370m, clear-cut, local clear-off, Yongan Bridge hole 66m, reinforcement of old bridge, construction of two new rubber dams to meet the water level for industrial and agricultural water withdrawal and beautification of the environment Claim. After “95.7” flood practice, it proves that the measures of comprehensive management and engineering are correct and great benefits have been achieved.