论文部分内容阅读
一、问题的提出三峡是我国伟大长江的主要控制枢纽。200公尺的高坝拦截了汹涌奔腾的长江激流,结束了威胁中下游千百万人民生命财产的水患历史;巨型电站建立后每年可以输出庞大的电力,使祖国北达首都;南到海南岛;东至上海;西至成都构成统一中心的输电系统,消灭了四川东部川江的航道天险,万吨巨轮终年通航;同时可将丰沛的江水北调,灌溉黄淮一带的广大平原。这个宏伟的工程将为祖国创造一幅多么美丽的图景啊!遵循毛主席指示的“积极准备,充分可靠”的精神,我们应该献
I. PROBLEM PROPOSALS The Three Gorges is the main control hub of the great Yangtze River in our country. The 200-meter high dam intercepts the turbulent Yangtze River rapids and ends the history of flooding that threatens the lives and property of millions of people in the middle and lower reaches. After the giant power station is established, it can output huge amounts of electricity each year, bringing the capital to the north of the motherland and Hainan Island to the south ; East to Shanghai; Chengdu to form a unified center of the transmission system, eliminating the Sichuan Chuanjiang River in the east of natural hazards, 10,000-ton ship navigable year-round; at the same time can be abundant in the river north of irrigation, irrigation Huanglong Huai area along the vast plain. What a magnificent project this grand project will bring to the motherland! Following the principle of “active preparation, full and reliable” as indicated by Chairman Mao, we should offer