湛江港一区高桩框架式钢筋混凝土码头是建国初期自行设计、施工的第一座大型深水港码头。现经25年来的投产使用,码头上部结构遭到南方沿海环境的严重侵蚀、破损较剧。为此,决定对此码头进行修复或重建,并召开了多次研讨会。但目前尚存在着不同的看法和意见。下面发表的文章代表着一部分支持修复方案的人的看法和意见,以供有关领导和工程技术人员参考。
Zhanjiang Port a high-pile frame reinforced concrete wharf was built in the early days of their own design, construction of the first large-scale deep-water port. Now that it has been put into operation for 25 years, the superstructure of the wharf has been seriously eroded by the coastal environment in the south and its damage has become more serious. To this end, the decision to repair or rebuild the pier, and held a number of seminars. However, there are still different opinions and opinions. The articles published below represent some of the opinions and opinions of those who support the rehabilitation program for reference by the relevant leaders and engineers.