随着2000年和2001年南部西电东送通道第一批7个发输变电项目和第二批9个发输变电项目先后开工,为完成2005年输电广东1000万千瓦任务的大规模西电东送工程已经展开。西部贵州、云南、广西各省(区)动员各方面的力量,“举全省之力”加快水、火电工程建设。
With the start of construction of the first batch of 7 power transmission and transformation projects and the second batch of 9 power transmission and transformation projects in the south of the West-East Power Transmission Channel in 2000 and 2001, the large-scale transmission of Guangdong’s 10 million-kilowatt mission was completed in 2005. The West Power Transmission Project has already begun. Western Guizhou, Yunnan, and Guangxi provinces (autonomous regions) mobilized all aspects of their power and “could provide the province with the power to accelerate the construction of water and thermal power projects.