为明确钻爆法施工爆破后隧道的粉尘与有害气体分布情况,检验通风、防尘效果,分别利用风速仪、粉尘仪和气体检测仪对兰渝铁路四座高瓦斯隧道的风速、粉尘和有害气体进行现场测试。测试结果显示:穿山甲风机配合螺旋式风管的压入式通风的效果最好,采用这种配置通风20 min左右,掌子面附近的粉尘、SO2等有害气体浓度即降至允许浓度以下,通风30min左右CO浓度降至允许浓度以下。隧道内风速主要受断面大小、掘进长度和通风设备及其维护等影响,隧道断面对净化空气所需要的通风时间影响最大,风管漏风率次之,再次为通风长度。在确保设备维护和通风管理情况下,穿山甲风机高档配合螺旋风管可实现长距离通风。
In order to clarify the distribution of dust and harmful gas in the tunnel after blasting by blasting, the effects of ventilation and dust control were tested. The wind speed, dust and harmful gases of four high-gas tunnels of Lanzhou-Chongqing Railway were measured respectively by anemometer, dust analyzer and gas detector Conduct a field test. The test results show that: Pangolin fan with spiral duct pressure ventilation is the best, the use of this configuration ventilation for about 20 min, the face near the dust, SO2 and other harmful gas concentrations that fall below the allowable concentration, ventilation About 30min CO concentration dropped below the allowable concentration. The wind speed in the tunnel is mainly affected by the size of the section, the length of tunneling and the ventilation equipment and maintenance. The tunnel section has the greatest influence on the ventilation time required for purifying the air, the second is the air leakage rate, and the second is the ventilation length. In ensuring the equipment maintenance and ventilation management, psoriasis fan with high-grade spiral duct can be achieved long-distance ventilation.