论文部分内容阅读
一、省领导很重视引黄工程,这一工程在水利建设上是有重大意义的。过去有些问题,大部都已解决,现在是坚决做的问题,施工过程中可能还有困难,但总的方面不会变动。任何工程从设计到规划到施工都要有许多困难的,我们要按「三年准备十年建设」考虑一下,五二年政治环境,国际地位都将有很大变化,人民生产要求也将更加提高。不管帝国主义如何破坏,不会影响我们的建设。引黄工程原计划五三年完成,我想不一定等到五三年。因为地方政府和广大人民都要求提前完成,起码按计划完成。建设往往赶不上群众要求,应该有这思想准备,顶好提前完成。因为我们不很熟练,施工中的具体困难应该估计到,而且加以研究解决。二、引黄工程在黄河中下游,是历史上的创举,同时是人民政府建立以来兴办的,他应该是榜样。在国民党反动统治下是做不出这成绩的。现
First, the provincial leaders attach great importance to the Yellow River Diversion Project. This project is of great significance in water conservancy construction. In the past, some problems have been solved, most of them have already been solved. Now it is a resolute problem. There may be difficulties in the construction process, but the overall aspect will not change. There must be many difficulties in any project from design to planning to construction. We must consider the “three years to prepare for ten years of construction.” In the year of 52, the political environment and international status will all undergo great changes, and the people’s production requirements will also increase. improve. No matter how imperialism is destroyed, it will not affect our construction. The original plan for the Yellow River Diversion Project was completed in 1973. I don’t think it will take five or three years. Because the local government and the broad masses of people all request early completion, at least as planned. Construction often fails to meet the demands of the masses. This ideological preparation should be completed and it should be completed in advance. Because we are not very skilled, the specific difficulties in construction should be estimated and studied. Second, the Yellow River Diversion Project is an innovation in history in the middle and lower reaches of the Yellow River. It was also established since the establishment of the People’s Government. He should be an example. Under the Kuomintang reactionary rule, this cannot be achieved. Now