论文部分内容阅读
辽宁省辽中县根据地理条件和气候特点,在防洪设施完善后,,根据省依河系划分涝区的要求和省“分区排水”的规划设计原则,确定了高水高排,低水低排,自排和机排相结合的原则,重点大搞改洼治涝工程,全县形成辽绕、辽浑蒲、浑蒲3大涝区。在辽绕涝区中,建成袁海亮、贺家、王回窝堡、3涝片在辽蒲涝区中建成王家岗、民畎两涝片;浑蒲涝区中建成于家台、乌伯牛、黑鱼沟、细河4涝片。
Liaoning Province, Liaoning Province, according to the geographical conditions and climate characteristics, after the flood control facilities are improved, according to the requirements of the province according to the river division of the floodplain and the provincial “district drainage” planning and design principles to determine the high water high row, low Low row of water, from row and machine row combination of the principle of focusing on big change to water treatment project, the county formed Liao around, Lupu Pu, muddy three floods. In the flood-waterlogged area of Liaoning, Yuan Hailiang, Hejia, Wangxuowu Fort and 3 waterlogging tablets were built into the Wangjiagang and Minxie floodplains in the Liao Po waterlogged area. In the muddy waterlogged area, Yujialiang and Uber , Black fish ditch, thin river 4 flood tablets.