论文部分内容阅读
高层建筑多层地下室结构逆作法施工工法(YJGF02-96)上海市第二建筑工程公司在建筑物和管线密集的地下高水位软土地基上建造高层建筑多层地下室,对深基坑的围护变形和土体的位移、地表和管线沉降等各项指标均有严格要求。采用“高层建筑地下室逆作施工技术”能...
High-rise multi-storey basement structure reverse construction construction method (YJGF02-96) Shanghai Second Construction Engineering Co., Ltd. builds high-rise multi-story basement on the dense underground high water soft foundation of buildings and pipelines to enclose the deep foundation pit Deformation and soil displacement, surface and pipeline settlement and other indicators have strict requirements. Adopt “High-rise building basement reverse construction technology” energy...