论文部分内容阅读
北京市地下铁道工程复兴门至八王坟新线工程提出明挖法,盾构法,明挖暗做法和新奥法等。前面几种施工方法在市政工程中是比较熟悉,新奥法这一名词在市政工程方面还是比较生疏的。“新奥法”是奥地利新的隧道修筑法的简称,原文是New Austrian Tunnell-ing Method,简称NATM。新奥法是
The Beijing Metro Project Fuxingmen to Bawangfen New Line project proposed digging method, shield method, digging dark method and the New Austrian law. In front of several construction methods in municipal engineering are more familiar with the new Austrian law, the term in municipal engineering is still relatively unfamiliar. The New Austrian Act is the abbreviation of Austria’s new tunnel construction law, the original is New Austrian Tunnell-ing Method, referred to as NATM. New Austrian law is