某年4月份,我局中马村矿井下2123盘区,一台40KW水泵的QC83—225操作开关着火,将开关外壳烧穿,芯子严重烧毁,并烧着进出线电缆,引起木棚着火,造成一起严重井下电气着火事故。 一、事故情况 供电系统如图1。该系统服务于整个2123盘区三层工作面;作业时间较长。当司泵工起动40KW水泵时,发现没电,电工到车头房变电所查看,发现此系统的低压总开关DW—80—350没有跳闸,但供180KVA变压器的PB_2—6高压防爆开关跳闸。未查清跳闸原因,就再次送电,送电后高爆开关没有跳闸,但变压器声音异常,过几分钟后拉掉高爆开关。当180KVA变压器二次送电时,2131盘区40KW水泵的QC83—225操作开关往外喷火,烧着电缆木棚,直至救护队下井扑灭。
In April of that year, Bureau QC28-225 operating switch of a 40KW pump was burned in the 2123 panel of the mine in Zhongma Village of our bureau. The switch case was burned through, the core was burned severely, and the incoming and outgoing cables burned, causing the fire in the wooden shed , Resulting in a serious downhole electrical fire accident. First, the accident situation Power supply system shown in Figure 1. The system serves three floors of the entire 2123 panel; longer operating hours. When the Division pump start 40KW pump, found no electricity, electrician to the front of the substation view and found that the system of low-voltage main switch DW-80-350 not tripping, but for the 180KVA transformer PB_2-6 high-voltage explosion-proof switch tripping. Did not find out the reason for the trip, once again send electricity, high-explosive power transmission switch did not trip, but the abnormal sound of the transformer, pulled off after a few minutes high-explosive switch. When the 180KVA transformer second power transmission, the 2131 panel 40KW pump QC83-225 operating switch out flames, burning cable shed, until the ambulance team went down quits.