我部过渡带抽油井,是采用集中加压、加热的掺热油伴随保温,高压热油或热水洗井的单井进站,站内分离器计量的工艺流程。由于抽油井产量低,含气少,给计量工作带来一定的困难。过去先后使用过冲塞式流量计,EF-430流量计,以及大秤秤量,计量车计量等方法。但由于原油含气和计量时间短,不能连续累积计量等原因,造成计量准确度差,甚至长期估产,不能录取单井产量,给地下分析和确定合理的油井工作制度带来很大困难。在毛主席“两论”思想指引下,我们急生产之所急,想工人之所想,同工人师傅共同总结了过去计量工作的经验教训,并在兄弟单位的大力支援下,我们采用中、低压椭圆齿轮流量计相减法,在莎东一号计量间进行了试验,经过和采油小队及施工单位工人师傅的共同努力,做到了施工投
I transition zone pumping wells, is the use of concentrated pressure, heating oil with heat insulation, high pressure hot oil or hot water well in a single pit pit stop station metering process. Due to the low production of pumping wells and low gas content, some difficulties have been brought to the measurement. In the past have used the plug-type flow meter, EF-430 flow meter, as well as the scale of weighing, measuring car measurement methods. However, due to the short time of gas containing gas and its measurement, it can not be continuously metered and other reasons, resulting in poor measurement accuracy or even long-term yield estimation. Therefore, single-well production can not be taken and great difficulties are caused for underground analysis and determination of a reasonable well working system. Under the guidance of Chairman Mao’s “two treatises”, we urgently needed urgent production and wanted the workers to think together. Together with the master workers, we summed up the experiences and lessons of the past measurement work. With the strong support from our brother units, Low-pressure elliptic gear flowmeter subtraction method, in Shaodong No. 1 measurement conducted tests, and after the production team and the construction unit workers master work together to achieve the construction investment