上海污水截流工程项目 (SWWTP)开始于 1998年 ,按照地理区域的不同正在分阶段完成。它包括遍布全城的大约五十个巨大泵站的部署工作 ,每一个泵站都将废水和生活污水排向位于浦东的污水预处理厂 ,然后通过 41km长的管道以 170× 10 4m3 /d的速度排入东海。项目的第一阶
The Shanghai Sewage Interception Project (SWWTP) started in 1998 and is being phased in by geographical area. It includes the deployment of approximately 50 huge pumping stations throughout the city, each pumping wastewater and domestic wastewater to a wastewater treatment plant in Pudong and then pumping it through a 41km long pipeline at 170 × 10 4 m3 / d The speed of discharge into the East China Sea. The first stage of the project