论文部分内容阅读
文章以供、用水部门提出的问题做为分析的着力点,分析河段上下游同步5年水文资料并提出结论,在今后河川径流量变化出现异常状况时,分析得到的结论对水利工程运行方式进行相应调整具有参考意义。
The article uses the questions raised by the water department as the focus of analysis, analyzes the upstream and downstream synchronization of the five-year hydrological data and draws a conclusion. In the future when the runoff of the river changes abnormally, the conclusion drawn from the analysis shows that the water conservancy project operation mode The corresponding adjustment has reference value.