论文部分内容阅读
分析了孔雀河第二、第三分水枢纽橡胶坝设计时和运行管理中存在着的问题,提出了橡胶坝运行技术措施及管理措施。
The problems existed in the design time and operation management of the second and third water diversion project rubber dam in Peacock River were analyzed. The technical measures and management measures for rubber dam operation were put forward.