摘要;在工民建工程实施的过程中,我们应该认真总结出建设单位、设计单位、监理单位以及施工单位的共同参与和控制的质量管理经验,探讨更加科学有效的措施和方法,以确保建筑工程施工工序建设的工程质量。实施建筑工程施工工序活动质量监控应分清主次、抓住关键,依靠完善质量体系和质量检查制度,确立建筑工程施工工序质量控制计划,设置建筑工程施工工序活动质量控制点,切实实现施工工程的最优化。
关键词:工民建; 施工; 质量管理Abstract;In the process of civil engineering practice, we should conscientiously sum up the common participation and control of construction units, design units, supervision units and construction units quality management experience, to explore the measures and methods more scientific and effective, in order to ensure that the construction process in building engineering project quality. The implementation of the construction project construction process quality monitoring should distinguish between primary and secondary, to seize the key, rely on perfect quality system and quality inspection system, the establishment of the construction project construction process quality control plan, set the construction process quality control point, to realize the optimization of construction project.
Keywords: Civil Engineering; construction; quality management
中图分类号:TU71
建筑工程施工的质量管理,是企业生产经营和发展过程中最经常、最大量的质量管理活动。施工质量管理水平的高低直接关系到工程质量目标的达成与否。一般而言,工民建施工的质量过程中,至少应关注到以下几个方面,才能确保整个施工过程的质量监管有的放矢、有章可循,达到管理的预期效果。具体是:
一、施工工序质量控制的内容
进行工民建施工的工序质量控制时,应着重于以下四方面的工作。
〔一)严格遵守工艺规程
施工工艺和操作规程,是进行施工操作的依据和法规,是确保工序质量的前提,任何人都必须严格执行,不得违犯。
(二)主动控制工序活动条件的质量
工序活动条件包括的内容较多,主要是指影响质量的五大因素:即施工操作者、材料、施工机械设备、施工方法和施工环境等。只要将这些因素切实有效地控制起来,使它们处于被控制状态,确保工序投入品的质量,避免系统性因素变异发生,就能保证每道工序质量正常、稳定。
(三)及时检验工序活动效果的质量
工序活动效果是评价工序质量是否符合标准的尺度。为此,必须加强质量检验工作,对质量状况进行综合统计与分析,及时掌握质量动态。一旦发现质量问题,随即研究处理,自始至终使工序活动效果的质量满足规范和标准的要求。
(四)设置工序质量控制点
控制点是指为了保证工序质量而需要进行控制的重点、或关键部位、或薄弱环节,以便在一定时期内、一定条件下进行强化管理,使工序处于良好的控制状态。
二、质量控制点的设置
质量控制点设置的原则,是根据工程的重要程度,即质量特性值对整个工程质量的影响程度来确定。质量控制点的涉及面较广,根据工程特点,视其重要性、復杂性、精确性、质量标准和要求,可能是结构复杂的某一工程项目,也可能是技术要求高、施工难度大的某一结构构件或分项、分部工程,也可能是影响质量关键的某一环节中的某一工序或若干工序。总之,无论是操作、材料、机械设备、施工顺序、技术参数、自然条件、工程环境等,均可作为质量控制点来设置。主要是视其对质量特征影响的大小及危害程度而定。兹列举如下:
(一)人的行为
某些工序或操作重点应控制人的行为,避免人的失误造成质量问题。如对高空作业、水下作业、危险作业、易燃易爆作业,重型构件吊装或多机抬吊,动作复杂而快速运转的机械操作,精密度和操作要求高的工序,技术难度大的工序等,都应从人的生理缺陷、心理活动、技术能力、思想素质等方面对操作者全面进行考核。事前还必须反复交底,提醒注意事项,以免产生错误行为和违纪违章现象。
(二)物的状态
在某些工序或操作中,则应以物的状态作为控制的重点。如加工精度与施工机具有关;计量不准与计量设备、仪表有关;危险源与失稳、倾覆、腐蚀、毒气、振动、冲击、火花、爆炸等有关,也与立体交叉、多工种密集作业场所有关等。也就是说,根据不同工序的特点,有的应以控制机具设备为重点,有的应以防止矢稳、倾覆、过热、腐蚀等危险源为重点,有的则应以作业场所作为控制的重点。
(三)材料的质量和性能
材料的质量和性能是直接影响工程质地的主要因素;尤其是某些工序,更应将材料质量和性能作为控制的重点。如预应力筋加工,就要求钢筋匀质!弹性模量一致,含硫(S)量和含磷(P)量不能过大,以免产生热脆和冷脆;N级钢筋可焊性差。易热脆,用作预应力筋时,应尽量避免对焊接头,焊后要进行通电热处理。又如,石油沥青卷材,只能用石油沥青冷底子油和石油沥青胶铺贴,不能用焦油沥青冷底子油或焦油沥青胶铺贴。否则,就会影响质量。
(四)关键的操作
如预应力筋张拉。在张拉程序中,要进行超张和持荷2min。超张拉的目的.是为了减少混凝上弹性压缩和徐变,减少钢筋的松弛!孔道摩阻力、锚具变形等原因所引起的应力损失;持荷2min的目的,是为了加速钢筋松弛的早发展,减少钢筋松弛的应力损失。在操作中,如果不进行超张拉和持荷2min,就不能可靠地建立预应力值:若张拉应力控制不准,过大或过小,亦不可能可靠地建立预应力值,这均会严重影响预应力构件的质量。
(五)技术间隙
有些工序之间的技术间歇时间性很强,如果不严格控制亦会影响质量。如分层浇筑混凝土,必须待下层混凝士未初凝时将上层混凝土浇完;卷材防水屋面,必须待找平层干燥后才能刷冷底子油,待冷底子油干燥后,才能铺贴卷材。
(六)技术参数
有些技术参数与质量密切相关。亦必须严格控制。如外加剂的掺量,混凝土的水灰化,沥青胶的耐热度,回填三合土的最佳含水量,灰缝的饱满度,防水混凝土的抗掺标号等,都将直接影响强度、密实度、抗渗性和耐冻性,亦应作为工序质量控制点。
(七)常见的质量通病
常见的质量通病,如渗水、漏水、起壳、起砂、裂缝等,都与工序操作有关,均应事先研究对策,提出预防措施。
(八)新工艺、新技术、新材料应用
新工艺、新技术、新材料虽己通过鉴定、试验,但施工操作人员缺乏经验,又是初次进行施工时,也必须对其工序操作作为重点严加控制。
三、工序质量的检验
工序质量的检验,就是利用一定的方法和手段,对工序操作及其完成产品的质量进行实际而及时的测定、查看和检查,并将所测得的结果同该工序的操作规程及形成质量特性的技术标准进行比较,从而判断是否合格或是否优良。
工序质量的检验,也是对工序活动的效果进行评价。工序活动的效果,归根結底就是指通过每道工序所完成的工程项目质量或产品的质量如何,是否符合质量标准。为此,工序质量检验工作的内容主要有下列几项:
(一)标准具体化
标准具体化,就是把设计要求、技术标准、工艺操作规程等转换成具体而明确的质量要求,并在质量检验中正确执行这此技术法规。
(二)度量
度量是指对工程或产品的质量特性进行检测度量。其中包括检查人员的感观度量、机械器具的测量和仪表仪器的测试,以及化验与分析等。通过度量,提出工程或产品质量特征值的数据报告。
(三)比较
所谓比较,就是把度量出来的质量特征值同该工程或产品的质量技术标准进行比较,视其有何差异。
(四)判定
就是根据此较的结果来判断工程或产品的质量是否符合规程、标准的要求,并作出结论。判定要用事实、数据说话。防止主观、片面,真正做到以事实、数据为依据,以标准、规范为准绳。
(五)处理
处理是指根据判定的结果,对合格与优良的工程或产品的质量予以认证;对不合格者,则要找原因,采取对策措施予以调整、纠偏或返工。
(六)记录
记录要贯穿于整个质量检验的过程中,就是把度量出来的质量特征值,完整、准确、及时地记录下来,以供统计、分析、判定、审核和日后查用。
四、结束语
建筑工程施工质量管理,是企业中最经常、最大量的质量管理活动,也是实现质量目标的基本保证。结合实际施工管理中常见的问题,对工序质量控制、质量控制点设置、工序质量检验等几方面展开探讨,并提出科学有效控制工民建施工质量的一些建议。
参考文献
1 聂万德.工民建施工中的质量控制[J].建设科技.2010(08)
2 张海军.工民建施工现场的质量问题及解决措施[J].城市建筑.2013(04)
3 刘春刚.工序质量控制对工民建施工的影响[J].科技传播.2010(12)
关键词:工民建; 施工; 质量管理Abstract;In the process of civil engineering practice, we should conscientiously sum up the common participation and control of construction units, design units, supervision units and construction units quality management experience, to explore the measures and methods more scientific and effective, in order to ensure that the construction process in building engineering project quality. The implementation of the construction project construction process quality monitoring should distinguish between primary and secondary, to seize the key, rely on perfect quality system and quality inspection system, the establishment of the construction project construction process quality control plan, set the construction process quality control point, to realize the optimization of construction project.
Keywords: Civil Engineering; construction; quality management
中图分类号:TU71
建筑工程施工的质量管理,是企业生产经营和发展过程中最经常、最大量的质量管理活动。施工质量管理水平的高低直接关系到工程质量目标的达成与否。一般而言,工民建施工的质量过程中,至少应关注到以下几个方面,才能确保整个施工过程的质量监管有的放矢、有章可循,达到管理的预期效果。具体是:
一、施工工序质量控制的内容
进行工民建施工的工序质量控制时,应着重于以下四方面的工作。
〔一)严格遵守工艺规程
施工工艺和操作规程,是进行施工操作的依据和法规,是确保工序质量的前提,任何人都必须严格执行,不得违犯。
(二)主动控制工序活动条件的质量
工序活动条件包括的内容较多,主要是指影响质量的五大因素:即施工操作者、材料、施工机械设备、施工方法和施工环境等。只要将这些因素切实有效地控制起来,使它们处于被控制状态,确保工序投入品的质量,避免系统性因素变异发生,就能保证每道工序质量正常、稳定。
(三)及时检验工序活动效果的质量
工序活动效果是评价工序质量是否符合标准的尺度。为此,必须加强质量检验工作,对质量状况进行综合统计与分析,及时掌握质量动态。一旦发现质量问题,随即研究处理,自始至终使工序活动效果的质量满足规范和标准的要求。
(四)设置工序质量控制点
控制点是指为了保证工序质量而需要进行控制的重点、或关键部位、或薄弱环节,以便在一定时期内、一定条件下进行强化管理,使工序处于良好的控制状态。
二、质量控制点的设置
质量控制点设置的原则,是根据工程的重要程度,即质量特性值对整个工程质量的影响程度来确定。质量控制点的涉及面较广,根据工程特点,视其重要性、復杂性、精确性、质量标准和要求,可能是结构复杂的某一工程项目,也可能是技术要求高、施工难度大的某一结构构件或分项、分部工程,也可能是影响质量关键的某一环节中的某一工序或若干工序。总之,无论是操作、材料、机械设备、施工顺序、技术参数、自然条件、工程环境等,均可作为质量控制点来设置。主要是视其对质量特征影响的大小及危害程度而定。兹列举如下:
(一)人的行为
某些工序或操作重点应控制人的行为,避免人的失误造成质量问题。如对高空作业、水下作业、危险作业、易燃易爆作业,重型构件吊装或多机抬吊,动作复杂而快速运转的机械操作,精密度和操作要求高的工序,技术难度大的工序等,都应从人的生理缺陷、心理活动、技术能力、思想素质等方面对操作者全面进行考核。事前还必须反复交底,提醒注意事项,以免产生错误行为和违纪违章现象。
(二)物的状态
在某些工序或操作中,则应以物的状态作为控制的重点。如加工精度与施工机具有关;计量不准与计量设备、仪表有关;危险源与失稳、倾覆、腐蚀、毒气、振动、冲击、火花、爆炸等有关,也与立体交叉、多工种密集作业场所有关等。也就是说,根据不同工序的特点,有的应以控制机具设备为重点,有的应以防止矢稳、倾覆、过热、腐蚀等危险源为重点,有的则应以作业场所作为控制的重点。
(三)材料的质量和性能
材料的质量和性能是直接影响工程质地的主要因素;尤其是某些工序,更应将材料质量和性能作为控制的重点。如预应力筋加工,就要求钢筋匀质!弹性模量一致,含硫(S)量和含磷(P)量不能过大,以免产生热脆和冷脆;N级钢筋可焊性差。易热脆,用作预应力筋时,应尽量避免对焊接头,焊后要进行通电热处理。又如,石油沥青卷材,只能用石油沥青冷底子油和石油沥青胶铺贴,不能用焦油沥青冷底子油或焦油沥青胶铺贴。否则,就会影响质量。
(四)关键的操作
如预应力筋张拉。在张拉程序中,要进行超张和持荷2min。超张拉的目的.是为了减少混凝上弹性压缩和徐变,减少钢筋的松弛!孔道摩阻力、锚具变形等原因所引起的应力损失;持荷2min的目的,是为了加速钢筋松弛的早发展,减少钢筋松弛的应力损失。在操作中,如果不进行超张拉和持荷2min,就不能可靠地建立预应力值:若张拉应力控制不准,过大或过小,亦不可能可靠地建立预应力值,这均会严重影响预应力构件的质量。
(五)技术间隙
有些工序之间的技术间歇时间性很强,如果不严格控制亦会影响质量。如分层浇筑混凝土,必须待下层混凝士未初凝时将上层混凝土浇完;卷材防水屋面,必须待找平层干燥后才能刷冷底子油,待冷底子油干燥后,才能铺贴卷材。
(六)技术参数
有些技术参数与质量密切相关。亦必须严格控制。如外加剂的掺量,混凝土的水灰化,沥青胶的耐热度,回填三合土的最佳含水量,灰缝的饱满度,防水混凝土的抗掺标号等,都将直接影响强度、密实度、抗渗性和耐冻性,亦应作为工序质量控制点。
(七)常见的质量通病
常见的质量通病,如渗水、漏水、起壳、起砂、裂缝等,都与工序操作有关,均应事先研究对策,提出预防措施。
(八)新工艺、新技术、新材料应用
新工艺、新技术、新材料虽己通过鉴定、试验,但施工操作人员缺乏经验,又是初次进行施工时,也必须对其工序操作作为重点严加控制。
三、工序质量的检验
工序质量的检验,就是利用一定的方法和手段,对工序操作及其完成产品的质量进行实际而及时的测定、查看和检查,并将所测得的结果同该工序的操作规程及形成质量特性的技术标准进行比较,从而判断是否合格或是否优良。
工序质量的检验,也是对工序活动的效果进行评价。工序活动的效果,归根結底就是指通过每道工序所完成的工程项目质量或产品的质量如何,是否符合质量标准。为此,工序质量检验工作的内容主要有下列几项:
(一)标准具体化
标准具体化,就是把设计要求、技术标准、工艺操作规程等转换成具体而明确的质量要求,并在质量检验中正确执行这此技术法规。
(二)度量
度量是指对工程或产品的质量特性进行检测度量。其中包括检查人员的感观度量、机械器具的测量和仪表仪器的测试,以及化验与分析等。通过度量,提出工程或产品质量特征值的数据报告。
(三)比较
所谓比较,就是把度量出来的质量特征值同该工程或产品的质量技术标准进行比较,视其有何差异。
(四)判定
就是根据此较的结果来判断工程或产品的质量是否符合规程、标准的要求,并作出结论。判定要用事实、数据说话。防止主观、片面,真正做到以事实、数据为依据,以标准、规范为准绳。
(五)处理
处理是指根据判定的结果,对合格与优良的工程或产品的质量予以认证;对不合格者,则要找原因,采取对策措施予以调整、纠偏或返工。
(六)记录
记录要贯穿于整个质量检验的过程中,就是把度量出来的质量特征值,完整、准确、及时地记录下来,以供统计、分析、判定、审核和日后查用。
四、结束语
建筑工程施工质量管理,是企业中最经常、最大量的质量管理活动,也是实现质量目标的基本保证。结合实际施工管理中常见的问题,对工序质量控制、质量控制点设置、工序质量检验等几方面展开探讨,并提出科学有效控制工民建施工质量的一些建议。