论文部分内容阅读
古巴决定在(1986~1990)五年计划中修建250多座水电站,以减少对石油进口的依赖和保证偏僻地区供电。古巴计划在西部地区修建一系列装机容量为500~5000千瓦的小型水电站,并与国家电网连网。
Cuba decided to build more than 250 hydropower stations in its five-year plan (1986-1990) to reduce its dependence on oil imports and ensure power supply in remote areas. Cuba plans to build a series of small hydropower stations with installed capacity of 500-5000 kilowatts in the western region and connect it with the national grid.