京广线第6次提速更换道岔工作全面展开。为确保更换道岔施工人身和行车安全,必须做好施工人员安全教育,设专职防护员;拆除旧道岔、新道岔就位及设备开通后要加强检查平推整治等措施。
Beijing-Guangzhou line 6th speed change turnout work in full swing. In order to ensure the replacement of turnout construction and driving safety, construction workers must have safety education and full-time protective personnel. Measures such as demolition of old turnouts, installation of new turnouts and inspection of flat pushing and remediation after equipment opening should be carried out.