论文部分内容阅读
我矿主井为混合井,由一台KJ2×3×1.5D提升机配2.1m3双箕斗提升矿石,设计年提升量50万t,2003年实际提升量达到64万t。另一台KJ2×3×1.5D提升机为双层罐笼升降人员、物料及从-310 m水平提升9000余米掘进的岩石至-240 m水平充填采空区。主井各水平的摇台、阻车器、推车器均为风动没施,控制阀为风动转阀,由一名专职摇台工负责操作,使矿车实现进出罐笼的目的。罐笼升降的信号由信号工根据需要在信号室发送到提升机房,实现罐笼的提升和下放。
The mine main shaft is a mixed well. A KJ2 × 3 × 1.5D hoisting machine is equipped with 2.1m3 double skip to enhance the ore. The designed annual increase is 500,000t, and in 2003, the actual increase is 640,000t. Another KJ2 × 3 × 1.5D hoist is a double cage lift personnel, materials and rock climbing from 9,000 m up from -310 m to -240 m horizontal filling gob. The main shaft of the level of rocking platform, car stoppers, trolleys are pneumatic did not apply, the control valve for the pneumatic rotary valve, a full-time shake workers responsible for the operation, the tub to achieve the purpose of entering and leaving the cage. Cage lifting signals by signal workers in the signal room according to the need to send to the lifting room, to achieve cage lifting and decentralization.