论文部分内容阅读
小型水电站在丽水全县已经普遍开花结果,在短短半年中,全县不要国家一分钱,大兴水电站四十四座,其中二十四座已经建成发电,装机容量二百一十八瓩,正在施工的还有二十多处。我县在今年兴建的电站中,由于紧紧彻贯了依靠群众,勤俭办站的原则,采取了就地取材,因陋就简的做法,从而大大地降低了成本,节省了开支,做到了建站资金全部由群众自筹。在建站过程中,我们普遍推行了木制旋浆式水轮机,尽量利用木料来代替钢铁,解决了钢材缺乏的困难。如皮带盘、轨道改为活动底
Small hydropower stations in Lishui County has been the general flowering results in a short period of six months, the county does not want a penny, Daxing hydropower station forty-four, of which twenty-four have been completed power generation, installed capacity of two hundred and eighteen 瓩, There are more than twenty under construction. In this year’s power plant construction in our county, the principle of relying on the masses and building a thrifty and thrift business has been adopted in a thoroughgoing way, which has resulted in simpler and less costly procedures, greatly reducing costs and saving expenses, thus achieving the goal of building a full set of funds Self-raised by the masses. During the construction of the station, we generally promoted the wood-propelled turbine and tried to use wood instead of steel to solve the problem of lack of steel. Such as a belt reel, track to active bottom