论文部分内容阅读
计算建筑物地基土壤温度场和湿度场时 ,引入离散人工边界条件 ,并专门对人工边界的处理方法进行了研究与讨论 ,旨在使得对有建筑物的地基土壤温度场和湿度场的计算方法和结果更加合理。
When calculating soil temperature and humidity field of building foundation soil, the discrete artificial boundary conditions are introduced and the artificial boundary treatment method is studied and discussed. The purpose is to make the calculation method of the temperature field and the humidity field of the foundation soil with buildings And the result is more reasonable.