一九五三年本省水利工作,是遵照中央指示精神结合本省实际情况,以发展农田水利为主,结合进行防洪排水,防御旱、涝灾害,保证农田增产为方针,在一九五二年的工作基础上进行的。全年工作完成的主要情况是:灌溉工程:在大力发动群众和国家以贷款,投资扶助下,全年共兴修小型渠堰二千四百二十一条,可灌农田十成零六千零九十八亩,完成
In 1953, the province’s water conservancy work was guided by the spirit of the Central Committee in the light of the actual situation of the province and the principle of developing farmland and water conservancy. In connection with the policy of flood control and drainage, prevention of drought and floods, and ensuring farmland production increase, in 1952 Work done on the basis of. The main work completed in the year is as follows: Irrigation projects: In order to mobilize the masses and countries with loans and investment, a total of 2,421 small drainage weirs were revamped throughout the year, irrigating 10,060 fields Ninety-eight acres, completed