输变电工程设计阶段造价控制研究

来源 :中国集体经济 | 被引量 : 0次 | 上传用户:lvyuxuan3652008
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着总体用电量的不断上升,输变电工程建设投资的规模也在不断扩大。但是从输变电工程建设现状来看,大部分工程存在造价管理问题。文章首先从三个方面对我国输变电工程设计阶段造价管理存在的问题作了分析。然后在此基础上从五个方面论述了输变电工程设计阶段造价控制的措施。希望对我国输变电工程设计阶段造价管理的发展有所帮助。 As the overall electricity consumption continues to rise, the scale of transmission and transformation project construction investment is also constantly expanding. However, the current status of power transmission and transformation projects, most of the existence of cost management issues. The article first analyzes the existing problems of cost management in the design stage of power transmission and transformation project in our country from three aspects. Then on this basis, it discusses the measures of cost control in the design phase of transmission and distribution project from five aspects. Hope that China’s power transmission project design stage of the development of cost management help.
其他文献
由于保护地在进行蔬菜生产时每天的放风换气时间相对较短,使保护地内气体与保护地外气体交换受阻,导致一些有害气体容易在保护地内积累,并对蔬菜造成危害。常见的有害气体危害有
2003年3月,第十二届社区安全国际会议在香港举行,山东省济南市青年公园社区被作为全球11个有突出做法的社区之一,青年公园街道党工委书记、办事处主任孟祥晶在大会上做了题为《
日前,根据福州市委市政府统一部署和市政府相关文件精神,福州市属已改制集体企业管理职能移交工作会议在福州市政府东部办公区召开,会议研究布置市属已改制集体企业管理权变
研究豆类丝核菌次级代谢产物对鸡免疫功能的影响。试验一将200只14日龄健康未免疫雏公鸡随机分为8组,Ⅰ-Ⅳ组动物于14日龄以新城疫活疫苗滴鼻进行第1次免疫,2周后加强免疫1次
人言“父爱如山”,慈父仁母,父亲在许多人的心目中是大山,是脊梁,是精神支柱,是人生的一个指南针;更是我们的根,是脉脉永驻的亲恩厚情,是永远难以割舍的埋藏心底最深的情节。
企业的安全生产,包括企业的消防安全,是国民经济中的一个重要问题。建国以来,我国政府明确了“安全生产、预防第一”的指导方针,陆续建立了一系列法律法规,安全生产形势总的是好的
基于风作用下车辆模型行驶极限状态分析获得了相应的安全行驶临界风速,应用概率统计方法建立了桥位风速统计和极值风速概率分布模型,桥面风环境测速风洞试验给出了自然风与桥面
随着经济的快速发展和人类的文明与进步,城乡绿化、美化欣然崛起,发展速度之快,水平之高,模式之新,是以往所不能比拟的。特别是随着文明生态村镇的建设,大大加快了以绿化、美
银川滨河黄河大桥主桥采用三塔双索面结合梁自锚式悬索桥,跨径布置为(88+218+218+88)m。加劲梁为钢-混凝土结合梁,钢梁采用双主纵梁梁格体系,桥面板采用钢筋混凝土结构,钢梁与桥面