南疆吐库二线中天山隧道左洞出口反坡段施工中突遇高压涌水,准确判断掌子面涌水量及采取应对措施是施工中应重点考虑的因素,而水量的大小又直接关系到堵水、排水措施。通过超前探孔等措施收集涌水量等基础数据,引用古德曼经验式、水压力法及水文地质比拟法进行隧道最大涌水量估算和预测,为注浆堵水设计,合理规划排水方案提供可靠依据。采用RPD-150C多功能地质钻机进行超前钻孔,PHP-15注浆机进行帷幕注浆,通过提高注浆压力和注浆量,止水效果明显,达到限量排放目标。施工中优化排水方案,增设排水管道和改进排水泵站,快速有效地排出洞内地下水,确保隧道施工安全。
In the construction of the southern section of the second trunk of Toutu Cave in the Tottenham Tunnel, the sudden reversal of high-pressure gushing water suddenly occurred in the construction of the left-dong exit of the Tot-tung Tunnel. Accurate judgment of the influx of water from the palm face and its response measures are important considerations in construction. The amount of water is directly related to the blockage Water, drainage measures. The basic data such as gushing water was collected by means of advanced drilling and other measures. Goodman empirical formula, water pressure method and hydrogeology comparison method were used to estimate and forecast the maximum water inflow of the tunnel, which provided a reliable basis for grouting water plugging design and reasonable drainage planning in accordance with. RPD-150C multi-functional geological drilling rig for advanced drilling, PHP-15 grouting machine for curtain grouting, by increasing grouting pressure and grouting volume, water effect is obvious, reaching the limit emission targets. In the construction, the drainage plan will be optimized, additional drainage pipes and drainage pumping stations will be set up to discharge underground water quickly and effectively to ensure the construction safety of the tunnel.