2012年,首钢京唐炼铁部干部职工瞄准打造精品炼铁目标,科学求实,创新驱动,攻坚克难,大高炉冶炼技术取得突破性进展,提前16天完成全年生产任务,主要经济技术指标打破历史纪录27次,达到国内领先水平。2012年生产生铁889.8849万t,超作业计划39.8849万t;焦比完成305.1kg/t,比计划降低4.9kg/t;燃料比完成486.7kg/t,比计划降低8.3kg/t。京唐炼铁部积极探索大高炉冶炼技术运行体系,以“班清日结、周分析、月总结”为内容,建立高炉冶炼技
In 2012, Shougang Jingtang Iron & Steel Department cadres and workers aimed at building a high-quality ironmaking goal, scientific and realistic, innovation-driven, overcome difficulties, blast furnace smelting technology made a breakthrough, 16 days in advance to complete the annual production tasks, major economic and technical indicators to break the history Record 27 times, reaching the leading domestic level. In 2012, the production of pig iron was 8.8988.49 million tons and the super-operation plan was 398.849 million tons; the coke ratio was 305.1kg / t, 4.9kg / t lower than planned; and the fuel ratio was 486.7kg / t, 8.3kg / t lower than planned. Jing Tang Iron and Steel Exploration Department actively explore the blast furnace smelting technology operation system to “class Qing day knot, week analysis, month summary ” as the content, the establishment of blast furnace smelting technology