目前在我国实行的政府采购,从招标程序上看已经十分规范,但是,这种方式的集中采购与使用单位需求上存在着时间上的延迟,更严重的是,在政务信息网络和政务信息系统工程项目建设中,由于网络设备、系统软件等产品的技术含量高、使用要求复杂,在具体的操作中往往是建设方(甲方)习惯于直接找设备供应商或系统集成商拿系统设计方案(免费),然后请专家组进行评审,最后对评审方案进行招标,而系统集成商(乙方)中标后一般都是按甲方指定的供应商采购设备。稍加分析不难发现这里面的弊端有很多:
At present, the government procurement practiced in our country is very standardized from the point of view of the bidding procedure. However, there is a time lag between the centralized purchasing and using units in this way. More seriously, in the government information network and the government information system In the construction of the project, due to the high technical content of network equipment, system software and other products, the use requirements are complicated. In specific operations, the construction party (Party A) is often accustomed to directly find the equipment supplier or system integrator to take the system design proposal (Free of charge), and then ask the panel to review and finally invite bidding for the appraisal scheme. After the system integrator (Party B) wins the bidding, it usually purchases the equipment according to the supplier specified by Party A. A little analysis is not difficult to find that there are many drawbacks: