【案情简介】2006年12月份,由浙江A公司(系总承包方)、沈阳B公司(系指定分包单位,持有机电设备安装工程三级资质)与业主签订《空调工程分包协议》,分包协议约定:(1)属于总包范围内的空调工程由业主指定分包给沈阳B公司;(2)指定分包工期应按总承包方浙江A公司的进度安排完成,指定分包工程不得使总承包方的施工进度受到影响;(3)分包工程价款为3200万,
【Brief introduction of the case】 In December 2006, the Company signed the subcontracting agreement of air-conditioning project with the owner by Zhejiang A Company (the general contractor) and Shenyang B Company (the designated subcontractor, with the third-class qualification of mechanical and electrical equipment installation) , Subcontracting agreement: (1) belongs to the total contract within the scope of the air-conditioning project assigned by the owner subcontracted to Shenyang B Company; (2) the designated sub-contract duration shall be completed by the general contractor Zhejiang A company schedule, the designated sub-package The project shall not affect the construction progress of the general contractor; (3) The price of subcontracting project is 32 million yuan,