继续深化改革 依靠科学技术进一步改变煤炭基本建设的技术面貌——建井科技现状及对前景的展望

来源 :建井技术 | 被引量 : 0次 | 上传用户:greatbear1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
“七五”以来,我国煤炭基本建设的科研、设计和生产等方面,均取得了可喜的进步,1988年投产矿井28处(新建19处,改扩建9处),新增年生产能力30.9Mt,创历史最高水平。在矿井建设过程中,加强了设备的研制,注意了机械化配套,改进了施工工艺,开展了施工组织科学化的研究与开发,深入地进行了设计改革.这些,对加快基本建设速度、提高基本建设经济效益,起到了积极的推动作用。 Since the Seventh Five-Year Plan, we have made gratifying progress in the scientific research, design and production of coal infrastructure in our country. In 1988, we put into operation 28 mines (19 newly built and 9 expanded and rebuilt) and added an annual production capacity of 30.9Mt , The highest level in history. In the course of mine construction, we have strengthened the development of equipment, paid attention to mechanization, improved construction technology, conducted scientific research and development of construction organization, and carried out design reform in depth, which are of great significance in accelerating the speed of infrastructure construction, Construction of economic benefits, played a positive role in promoting.
其他文献
东庞煤矿是河北省南部最大的矿井,设计生产能力180万t/a。1983午12月26日,矿井一期工程投产,投产能力120万t/a。投产后一边生产,一边抓二期工程。 1985年,在编制矿井“七·
1984年以来,我局认真贯彻落实原煤炭部历次生产工作会议和顶板管理工作会议精神,以及一系列有关顶板管理方面的规定和要求,依靠技术进步,严格现场管理,提高职工素质,大搞质
目的:1.随着耳科疾病诊断及治疗的不断发展,内耳的精确解剖结构与空间关系的重要性日益突出,通过连续切片得到内耳的三维几何模型,可以显示耳蜗及前庭系统的骨迷路、膜迷路和
在《鹿》中,“鹿”既是自我与救赎的双重象征,又在某种程度上暗示了死亡和悲剧.混乱的年代在人的内心留下阴影,艾丝特在创伤中挣扎,然而终究未能打败过去,萨博·玛格达向人们
为加快大学生通识能力的培养,顺应新时代高校人才培养的新形势,苏州大学图书馆不断探索实施新的人才培养方式,为大学生搭建优质的通识能力培养空间,创建“一站式”通识教育平
目的:   研究肺鳞癌的影像学表现,探讨其影像特征,提高其影像学诊断的准确度,为临床早期治疗创造条件。   方法:   收集46例经手术病理证实的肺鳞癌,对其术前胸部CT表
文章以67条美国高校图书馆发布的数字人文馆员招聘信息为研究对象,从招聘单位对应聘者的教育背景、专业知识、综合素质和相关工作经验的要求4个维度进行内容分析,归纳数字人
镇江市煤炭工业公司下属矿井有4对,其中3对是高沼气井、1对是瓦斯突出井,核定生产能力37万t/年。以往由于装备水平低,抗灾能力弱,管理水平跟不上,因而事故多,安全状况差,尤其
随着用工制度的改革,煤炭行业农民轮换工的数量越来越多。我们东庞煤矿仅采掘开单位就有农民轮换工865人,占采掘开工人总数的52%。这些轮换工大都是1983~1984年入矿的。经过几
煤矿机械工程师知识更新刊授班、研究班,经过煤矿机械工程系统4千余名技术人员3年多的实践,证明了“刊授”是高层次继续工程教育的一种可行办法,已经取得了一定实效和经验,