1983年11月底,在石臼港由交通部基建局和水规院主持召开了《海工高强钢丝、钢绞线予应力混凝土结构物施工技术暂行规定》(草案)审查会议,参加会议的有部各航务工程局的科研所、设计院、工程处和南科所以及铁道部、水电部和中国建研院等单位的代表.会上南科所详细介绍了该草案编制过程及其具体内容,经讨论,对以下问题有了一致的认识:
At the end of November 1983, a review meeting of “Interim Provisions on Construction Technology of High-strength Marine Steel Wires and Strand for Prestressed Concrete Structures” (draft) was held in Shijiugang by the Infrastructure Bureau and the Water Regulation Institute of the Ministry of Communications and attended the meeting. Scientific research institutes, design institutes, engineering institutes and SCN institutes of the air navigation engineering bureau, as well as the representatives of the Ministry of Railways, the Ministry of Water Resources and Electric Power and the China Construction Research Institute, etc. At the meeting, Nanke made a detailed introduction of the compilation process and its specific contents, After discussion, there is a consensus on the following issues: