当前,在建筑行业中对墙体进行浇注的过程中,常见的方法是先浇注墙体混凝土,在浇注楼板,采用这种施工方式,在施工质量上容易出现较大的问题,且工程耗时较长,造成大量人力、物力资源的浪费。基于此,在高层剪力墙结构混凝土整体浇注技术中,首先浇注楼板模板,再进行墙体模板的浇注,可以提高建筑施工质量,降低施工成本的前期投入、缩短施工工期,为保证高层剪力墙结构混凝土的整体浇注的质量夯实基础。
Currently, in the construction industry in the process of pouring the wall, the common method is to pour concrete wall, the pouring of the floor, using this construction method, the construction quality prone to major problems, and the project time-consuming Longer, resulting in a lot of manpower and material resources waste. Based on this, in the whole concrete pouring technology of high-rise shear wall structure, pouring the floor slab first and then casting the wall slab can improve the construction quality, reduce the initial investment of construction cost and shorten the construction period, in order to ensure the high-rise shear The overall pouring of the wall structure of concrete ramming the basis of quality.