论文部分内容阅读
北环水系综合治理工程转河段是为恢复北京古都风貌,在旧转河基础上重新开挖的河道。工程的复杂性、难度和困难可想而知。北京燕波工程管理有限公司在公开招投标时中标,作为转河工程施工阶段监理单位。1 工程特点 转河工程位于北京市中心区的西北部,全长3.7km,绝大部分为新挖河道,河道挡墙结构分浆砌石贴坡式、混凝
Beihuan River Integrated Control Project to reach the river is to restore the ancient capital of Beijing style, in the old river based on the re-excavation of the river. Project complexity, difficulty and difficulty can be imagined. Beijing Yanbo Engineering Management Co., Ltd. won the bidding in the open bidding as construction supervision unit of the river diversion project. 1 Project Features River transfer project is located in the northwestern part of Beijing downtown area, a total length of 3.7km, the vast majority of new dredging, river retaining wall structure of masonry slope paste, coagulation