论文部分内容阅读
三峡工程“98·7”制冷系统试运行成功由长委设计院施工处设计、机电设备实验工厂制造的GKL型附壁式高效空气冷却器在三峡工程“98·7”混凝土拌合系统中试运行成功,能满足临时船闸及其有关项日浇筑对温控混凝土的要求,最近通过初步验收。高效空气冷却器是“9...
The trial run of “98 · 7” refrigeration system for the Three Gorges Project was successfully designed by the construction institute of the Design Institute of the CPC Central Committee. The GKL-type high-efficiency air coolers made by the Electromechanical Equipment Experimental Plant were tested in the “98.7” concrete mixing system of the Three Gorges Project Successful operation, to meet the temporary lock on the day and pour the temperature control of concrete requirements, recently passed the initial acceptance. High-efficiency air cooler is "9 ...