论文部分内容阅读
察尔森水库枢纽位于嫩江右岸一级支流洮儿河中上游,是以防洪、灌溉为主,结合发电、养鱼等综合利用的一座大型水库,是洮儿河干流惟一的控制性工程。 察尔森水库从1989年开始蓄水投入运行已11年,每年风浪及冰冻作用,使上游护坡多处出现凹陷、隆起或局部严重破坏,虽然经过年年维修,每年又都有不同程度和不同部位的破坏。特别是1998年的特大洪水,水库高水位运行时间较长,最高库水位达防洪高水位并运行了十几个小时,加重了迎水坡的破坏。为此,察尔森水库建设管理局对大坝干砌石护坡采取灌注混凝土措施,以
Located in the middle and upper reaches of Taoer River, a first-order tributary of the Nenjiang River, the Tarzan Reservoir is a large-scale reservoir that integrates power generation and fish farming. It is the only controlled project of the Taohe River. Since 1989, the Charlson Reservoir has been put into operation for 11 years. Every year, the storm surge and freezing effect make the upstream slope more prone to sag, bulge or partial destruction. Although it has been repaired annually, it has varying degrees and different degrees each year Parts of the destruction. Especially in the 1998 extraordinary flood, the reservoirs run at high water level for a long time, and the water level of the highest reservoir reaches the flood control high water level and has operated for more than ten hours, aggravating the damage to the water slope. To this end, the Charlson Reservoir Construction Bureau of the dam masonry slope to take concrete pouring measures to