论文部分内容阅读
鲁布革水电站溢洪道是首部枢纽的主要泄洪建筑物,位于左岸坝肩。净宽为30米,全长约510米。溢洪道泄量占首部枢纽总泄量的55~62%,对保坝有十分重要的作用。
The Lubuge Hydropower Station Spillway is the main flood discharging structure of the first hub and is located on the left bank abutment. Net width of 30 meters, a total length of about 510 meters. Spillway discharge accounts for 55 ~ 62% of the total discharge of the first hub, which plays an important role in dam protection.