青铜峡唐渠电站是我区第一个合资兴建的水电基建项目,于1993年5月8日开工。青铜峡唐渠电站将安装一台3万千瓦水电机组,计划建设工期27个月,建设总投资1.05亿元,由自治区电力局和青铜峡市利达公司合资兴建。宁夏电力建筑安装工程公司对该工程实行总承包。该工程依托青铜峡水利枢纽的河西总干渠补充水量进行发电,是我区的一项重要节能项目。昔日,为了满足青铜峡水利枢纽河西总干渠灌溉用水的流量要求,流入渠内的黄河之水除青铜峡水利枢纽1号机组发电尾水外,还通过灌溉孔注入大流量的补充水量。据统计,青铜峡水利枢纽对河西总干
Qingtongxia Tangqu Hydropower Station is the first joint venture in our region to build hydropower infrastructure projects, started in May 8, 1993. Qingtongxia Tangqu Hydropower Station will install a 30,000 kilowatts hydropower units, the planned construction period of 27 months, a total investment of 105 million yuan, by the Autonomous Region Authority and Qingtongxia City Leader Company joint venture. Ningxia Electric Power Construction and Installation Engineering Company to implement the general contracting of the project. The project relies on Qingtongxia Hydro Project Hexi main canal to add water for power generation, is an important energy-saving projects in our region. In the past, in order to meet the flow requirements of irrigation water for the Hexi main canal of the Qingtongxia Water Control Project, the Yellow River water flowing into the canal was injected into the tailrace of the Qingtongxia Hydro-junction Project through the irrigation holes to inject a large volume of supplementary water. According to statistics, Qingtongxia Hydro Project on the Hexi general