老牛沟铁矿区自一九七六年开始转入低缓异常深部验证工作,至一九八○年钻孔的平均深度逐步增加,分别为280m、310m、520m、550m 和560m。一九七四年前,大口径钻粒钻进中采用普通泥浆即可顺利施工。但随着小口径金刚石钻进的应用和推广,普通细分散泥浆已不适应,采用清水钻进,由于地层复杂,坍塌掉块、漏水、涌水给施工造成极大困难,甚至无法正常生产。这是老牛沟矿区小口径金刚石钻进中的主要技术难题。因此,老牛沟铁矿区复杂地层钻进中的护壁问题成为我们亟待解决的研究课题。
Lao Yougou Iron Ore Project has been involved in the low-temperature and deep-level verification since 1976, and the average depth of drilling holes gradually increased in 1980 to 280m, 310m, 520m, 550m and 560m respectively. Before 1974, large-diameter drill bit drilling can be used to smooth the construction of ordinary mud. However, with the application and promotion of small-diameter diamond drilling, ordinary finely divided mud has become unsuitable. When drilling with clear water, due to the complicated stratum, collapsing block, water leakage and gushing water make great difficulties to the construction and can not even be produced normally. This is the main technical problem in drilling small-diameter diamonds in Laohugou Mine. Therefore, the protection of the wall in complex formations in Laoyougou iron mine area has become a research topic to be solved urgently.