水利水电建设总局于1963年1月7日至16日在新安江召开了水电站机电设计专业会议。参加这次会议的,有水利电力部技术委员会、各有关勘测设计院、运行电厂、水轮发电机制造厂、科学研究部门等28个单位的代表。会议由水利水电建设总局副局长鲁平同志主持。会议着重总结了几年来水电站机电设计的工作,交流了各地经验。在总结、交流经验的基础上,分成四个专业小组,分别讨论了主结线、控制设备布置、水轮机安装高程、钢筋混凝土闸门等23个比较主要的而又是急待解决的技术专题。本刊本期发表的“水力机械”、“电工一次回路”、“电工二次回路”、“金属结构”等四个专题文件,就是上述23个专题综合整理的。讨论中,同志们本着百花齐放、百家争鸣的精神,互相摆观点、摆看法,然后逐步求得思想一致。因此,这四个专题文件的讨论是比较成熟的,可供水电站机电设计工作者参考、运用。但由于参加会议人数有一定局限性,同志们如有不同意见,尚可展开讨论。至于有一些尚未取得意见一致的问题,与会同志也互相交换了看法,起到了相互学习、相互促进的作用,有利于今后进一步求得解决。
The General Administration of Hydraulic and Hydropower Construction held a meeting on mechanical and electrical design of hydropower stations in Xin’anjiang from January 7 to January 16, 1963. Participate in this meeting, the Ministry of Water Conservancy and Electric Power Commission, the relevant survey and Design Institute, the operation of power plants, hydroelectric generator manufacturing plants, scientific research departments and other representatives of 28 units. The meeting was hosted by Comrade Lu Ping, deputy director of the Bureau of Hydraulic and Hydropower Construction. The meeting focused on the past few years, hydroelectric station design work, exchange of experience. On the basis of summarizing and exchanging experience, the four professional groups were divided into three major technical issues that are urgently needed to be solved, including the main knot line, the layout of control equipment, the installation elevation of hydraulic turbines and the reinforced concrete gate. This issue of the issue of “hydraulic machinery”, “electric circuit”, “electrician secondary circuit”, “metal structure” and other four special documents, is the above-mentioned 23 topics consolidated. In the discussion, the comrades, in the spirit of letting a hundred flowers blossom and their schools of thought contend with each other, put each other’s perspectives and put their opinions on one another, and then gradually seek the consensus of ideas. Therefore, the discussion of these four thematic papers is relatively mature, which can be used for the reference of hydropower station electromechanical design workers. However, due to the limited number of people attending the meeting, comrades can still hold discussions if they have different opinions. As for some issues that have not yet reached the consensus, the participating commanders also exchanged views with each other and played the role of mutual learning and mutual promotion so as to further seek solutions in the future.