我场一队2号井,于1980年5月竣工。井深131米,静水位105.4米,动水位106.9米,107米以下为滤水管,井管为12英寸铸铁管。井打成后由于没买到合适的深井泵,一直未装泵抽水。后来发现封闭井口的圆铁板因焊得不牢被儿童敲掉了,并向井
My field team No. 2 well, completed in May 1980. 131 meters deep, quiet water level 105.4 meters, moving water level 106.9 meters, 107 meters below the filter pipe, well pipe is 12 inches cast iron pipe. Wells have not been installed because the pump did not get the right pump has been installed. Later, it was discovered that the round iron plate of the closed wellhead was knocked out by the child due to the poor welding, and the well was turned to the well