在山东邹平段有一个长达1600多米的挑水坝,它就是梯子坝险工。该坝建于1884年,原长3000米,用秸草裹头。当时修建的目的是为了保护在其下游约18华里,右岸的芥东县城。但经1892年大水后,该坝冲毁1000米左右,河槽南移,县城全部坍入河中。此后虽经维修,到解放时还是用桔草护头,仅抛了少量砖石护根。解放后几经加固维修,坝基长度今为1640
In Zouping section of Shandong has a more than 1,600 meters of pick the dam, it is a ladder dam. The dam was built in 1884, the original length of 3000 meters, wrapped with straw. The purpose of the building was to protect the town of Tohoe on the right bank, about 18 miles down the river. However, after the flood in 1892, the dam destroyed about 1000 meters and the river channel moved southward. All of the county collapsed into the river. Although after maintenance, to liberation or with citrus grass head, throwing only a small amount of masonry. After the liberation of several reinforcement maintenance, dam base length is 1640