齐鲁乙烯工程芳烃装置有两台从日本引进的离心式压缩机,其主要性能见下表。机器初找正后的二次灌浆属无垫铁灌浆施工,要求使用300号微收缩水泥砂浆,当时在严冬季节施工难度是很大的,日平均气温-2℃,最低气温为-11℃,二次灌浆随时有被冻坏的危险。工期紧,灌浆5天后,砂浆抗压强度要达到设计强度,机器进行最终找正。二次灌浆砂浆必须是微收缩砂浆,灌浆层的最终收缩量
Qilu ethylene engineering aromatics plant has two centrifugal compressors imported from Japan. Its main performance is shown in the table below. The secondary grouting after the machine has been found is a horn-free grouting construction and requires the use of No. 300 micro-shrinkage cement mortar. At that time, the construction is difficult in the severe winter season. The average daily temperature is -2°C and the minimum temperature is -11°C. Secondary grouting has the danger of being frozen at any time. With tight schedule, after 5 days of grouting, the compressive strength of the mortar should reach the design strength, and the machine should make final corrections. The secondary grouting mortar must be a micro-shrink mortar and the final shrinkage of the grouting layer