“十二五”期间,我国将建设数万km的油气长输管道,隧道穿越工程作为油气长输管道建设中必不可少的组成部分,是管道项目的控制性工程。通过对管道隧道项目实施EPC总承包模式,建设过程中发挥“以设计为龙头”的优势,动态设计、动态施工,促进隧道和管道项目的建设。结合油气长输管道隧道项目建设的特点,分析项目风险的产生过程,提出油气管道隧道项目EPC的风险控制和应对策略。
During the 12th Five-Year Plan period, tens of thousands of kilometers of long-distance oil and gas pipelines will be built in our country. Tunnel crossing project is an indispensable component in the construction of long-distance oil and gas pipelines and is a controlled project of pipeline project. Through the implementation of EPC general contracting mode for pipeline tunnel projects and the advantages of “design as a leader” in the construction process, the Company will design and construct dynamically so as to promote the construction of tunnels and pipelines projects. Combined with the characteristics of the construction of the long-distance oil and gas pipeline project, the generation process of the project risk is analyzed and the risk control and countermeasures of the EPC project of the oil and gas pipeline tunnel project are put forward.