论文部分内容阅读
A system consisting of a two-stage up-flow anaerobic sludge blanket (UASB),an anoxic/aerobic (A/O) reactor and a sequencing batch reactor (SBR),was used to treat landfill leachate.During operation,denitrification and methanogenesis took place simultaneously in the first stage UASB (UASB1),and the effluent chemical oxygen demand (COD) was further removed in the second stage UASB (UASB2).Then the denitrification of nitrite and nitrate in the reted sludge by using the residual COD was accomplished in the A/O reactor,and ammonia was removed via nitrite in it.Last but not least,the residual ammonia was removed in SBR as well as nitrite and nitrate which were produced by nitrification.A system consisting of a two-stage UASB and an A/O reactor was used to achieve the stable short-cut nitrification in the first stage (60 d).The effluent of stage one was treated by SBR in the second stage (60 d).The results over 120 d were as follows: when the total nitrogen (TN) concentration of influent leachate was about 2500 mg/L and the ammonia nitrogen concentration was about 2000 mg/L,the short-cut nitrification with 85%-90% nitrite accumulation was achieved stably in the A/O reactor.The TN and ammonia nitrogen removal efficiencies of the system were 98% and 97%,respectively.The residual ammonia,nitrite and nitrate which were produced by nitrification in the A/O reactor could be washed out almost completely in SBR.The TN and ammonia nitrogen concentrations of final effluent were about 39 mg/L and 12 mg/L,respectively.