水电工程成本测算应以工程技术规程规范和施工组织设计为基础,对构成工程实体的人材机消耗量数据进行记录;水电工程成本分析应以工序划分、资源配置和劳动组合为单元,分析构成工程实体所消耗人材机数量的合理性和规律性;水电工程成本对比是在成本测算的基础上,与其工程价值进行对比,其中包含人材机消耗量,基础价格、取费标准等诸多相关因素。没有对施工过程的全面了解以及对相关技术文件和规程规范的全面掌握;没有对构成工程实体所消耗人材机数量合理性的分析;没有与能够体现其工程价值量的对比,就不算真正意义的工程成本。
Hydropower project cost estimates should be based on engineering specifications and construction design, based on the engineering entity of the human resource consumption data records; hydropower project cost analysis should be divided by processes, resource allocation and labor portfolio as a unit, analysis of the construction project The rationality and regularity of the number of personnel consumed by the entity are compared. The comparison of the cost of hydropower project is based on the cost estimation and the comparison with the engineering value, which includes many relevant factors such as the consumption of human resources machine, the basic price and the standard of taking charges. There is no comprehensive understanding of the construction process as well as a comprehensive grasp of the relevant technical documents and rules and norms; there is no analysis of the rationality of the number of talents consumed by the engineering entities; there is no real significance in comparison with the amount of engineering value embodied Engineering costs.