论文部分内容阅读
水利电力部委托珠江水利委员会于1983年5月21日至25日在广州主持召开了《北江大堤加固工程总体设计》审查会议。会议听取了广东省水电设计院关于编制《总体设计》和芦苞闸情况以及加固方案的汇报。与会同志经过现场察看和认真讨论,基本同意《总体设计》。会议认为,北江大堤是捍卫广州、佛山等重要城市和300多万人口,100万亩农田的重要堤防。解放后,经过多次培修,虽然具有一定规模,但是,由于堤基有22公里系强透水层,每遇洪水,险情严重,需要于近年内及早培修加固。芦苞闸也需要进行加固和部分改建。
The Ministry of Water Resources and Electric Power commissioned the Pearl River Conservancy Commission to hold a review meeting on “Overall Design of Beijiang Levee Reinforcement Project” in Guangzhou from May 21 to May 25, The meeting listened to the Guangdong Provincial Hydropower Design Institute on the preparation of “overall design” and Lu Bao brake conditions and reinforcement programs report. After attending the meeting, the participating commenters inspected and seriously discussed the issue and basically agreed with the “overall design.” The meeting held that the Beijiang Levee is an important embankment to defend important cities such as Guangzhou and Foshan, and more than 3 million population and 100 million mu of farmland. After the liberation, after several trainings, although it has a certain scale, due to the fact that the embankment has 22 kilometers of strong permeable layers, each flood event is in serious danger and needs to be hardened early in recent years. Lu bazi also need to be reinforced and partially rebuilt.