三門峡水电站位于峡谷地区,从施工观点上来說地形甚为复杂,两岸山崖陡峭,溝嶺重叠。埧址处多削壁陡崖,且具極易沉陷的深厚黄土复盖層,河床狭窄,在埧址前形成急骤轉弯。又有三座石岛屹立河心,汛期洪流兇猛,水势險急,夹有大量泥沙,施工时經常遭受泥沙淤灌及冰淩、洪水的威胁,且工程量特別浩大,全部混凝土及鋼筋混凝土工程量約300万立方公尺,总挖方約1200万立方公尺,填方
Sanmenxia Hydropower Station is located in the gorge area, from the construction point of view terrain is very complex, steep cliffs across the Taiwan Strait, Gou Ridge overlap. There are many cliffs and cliffs on the cliffs, with extremely thick loess overburden that is easily subsided. The riverbed is narrow and a sharp turn is formed before the site. Three more Shek Kip erected in the heart of the river, fierce floods in flood season, water potential urgent, sandwiched a lot of sediment, construction often suffer from siltation and ice, floods, floods, and the project is particularly vast, all concrete and reinforced concrete works About 3 million cubic meters, total excavation of about 12 million cubic meters, fill